    Redevelopment Lauwersoog | The Netherlands

    Project type
    Harbour construction: new quay wall and ship lift. First project with AZ28-750 in the Netherlands.

    Products
    Sheet piles AZ28-750: 670 tons

    Owner
    Province of Groningen;
    Exploitatiemaatschappij Havencomplex Lauwersoog


    A2 motorway tunnel - Maastricht | The Netherlands

    Project type
    Road construction: new tunnel

    Products
    Sheet piles: 15 000 tons

    Owner
    Ministry of Infrastructure and the Environment
    Municipality Maastricht


    Green Port Hull | United Kingdom

    Project type
    Harbour construction: deep sea quay wall

    Products
    Sheet piles: 1 683 tons
    Steel tubes: 14 703 tons

    Owner
    Siemens and Associated British Ports


    Reconstruction Lock Harelbeke | Belgium

    Project type
    Inland waterways: reconstruction of the existing lock and weir.

    Products
    Sheet piles: 13 000 tons
    Steel tubes: 4 500 tons

    Owner
    Flemisch Government (Waterwegen en Zeekanaal)

    More


    Widening Amazonehaven - Rotterdam | The Netherlands

    Project type
    Harbour construction: quay wall

    Products
    Steel tubes: 13 930 tons + 420 tons (AMLoCorTM)
    Sheet piles: 3 860 tons + 120 tons (AMLoCorTM)

    Owner
    Havenbedrijf Rotterdam

    More


    East Quay - Port of Piombino - Livorno | Italy

    Project type
    Harbour construction: quay wall

    Products
    Steel tubes: 5 501 tons
    Sheet piles: 702 tons
    Clutches: 61 tons
    Reinforcement plates: 559 tons

    Owner
    Autoritá Portuale di Piombino

    More


    Tresfjord bridge - Vestnes | Norway

    Project type
    Road construction: bridge foundation on tubular piles.

    Products
    Steel tubes: 4,665 tons
    Rock shoes and cover plates: 583 tons
    Rebar cages: 773 tons

    Owner
    Norwegian Public Roads Administration (Statens Vegvesen)

    More


    Hopmarkt underground car park - Aalst | Belgium

    Project type
    Three level underground car park: vibration-free installation of 100% watertight steel sheet pile walls.

    Products
    Sheet piles: 558 tons

    Concessionaire
    Interparking NV, Brussels

    More 


    New Lock Ivoz-Ramet - Flémalle | Belgium

    Project type
    Inland waterways: construction of new lock next to existing lock.

    Products
    Sheet piles: 1,828 tons
    Steel tubes: 322 tons

    Owner
    Service Public de Wallonie

    More


    LNG Terminal - Swinoujscie | Poland

    Project type
    Harbour construction: breakwater, loading quaywall and technical platform for LNG Terminal

    Products
    Steel pipes: 16,960 tons
    Sheet piles: 5,730 tons

    Owner
    Port of Swinoujscie

    More 


    Noise barriers A2 motorway - Eindhoven | The Netherlands

    Project type
    Road construction: combination of noise barriers and retaining walls for highway and parallel road

    Products
    Sheet piles: 14,560 tons

    Owner
    Rijkswaterstaat

    More 


    Harbour improvements - Montrose | United Kingdom

    Project type
    Harbour construction: quay walls for two new berths

    Products
    Steel pipes: 1,636 tons
    Sheet piles: 235 tons

    Owner
    Montrose Port Authority

    More 


    Liefkenshoek rail tunnel - Antwerp | Belgium

    Project type
    Tunnel construction: sheet pile pit for mortar and concrete ballast above two bored tunnels

    Products
    Sheet piles: 2,212 tons
    Sheet piles, buy-back part: 1,192 tons

    Owner
    Infrabel NV

    More 


    Quay walls and mooring dock - Cuxhaven | Germany

    Project type
    Harbour construction: quay walls and mooring dock

    Products
    Combi wall: 4,465 tons of steel pipes and 1,745 tons of sheet piles
    Temporary sheet piles: 375 tons
    Anchors: 2,435 tons of HTM profiles

    Owner
    Cuxport, Cuxhaven

    More


    Hadarom Terminal - Ashdod | Israel

    Project type
    Harbour construction: port construction

    Products
    Tubular pipes: 15,000 tons
    Sheet piles (HZM/AZ): 26,600 tons
    Tie-rods: 500 tons
    Rebars: 14,000 tons

    Owner
    IPC Israel Port Company


    Hamifratz Terminal - Haifa | Israel

    Project type
    Harbour construction: port construction

    Products
    Sheet piles (HZM/AZ): 38,600 tons

    Owner
    IPC Israel Port Company


    El-tour Port Construction - Gulf Of Suez I Egypt

    Project type
    Harbour construction: port construction

    Products
    Tubular piles: 2,600 tons
    Sheet piles: 700 tons

    Owner
    Egyptian Navy

    More


    İski Infrastructure Project - İstanbul I Turkey

    Project type
    Infrastructure construction: potable water channel

    Products
    Sheet piles: 108 tons

    Owner
    İSKİ-İstanbul Water Projects Authority

    More


    Hartha Water Treatment Project - Basrah I Iraq

    Project type
    Water intake facility

    Products
    Sheet piles: 2,015 tons

    Owner
    Ministry of Municipalities and Public Works

    *Image: discharging process


    Maydon Wharf - Durban | South Africa

    Project type
    Harbour construction: reconstruction and deepening of Maydon Wharf Berth 1-4, 12-14

    Products
    HZM combi wall: 9,855 tons
    Z section sheet piles: 390 tons
    HP foundation piles: 1,322 tons

    Owner
    Transnet National Port Authority


    Luanda Fishing Port - Luanda | Angola

    Project type
    Harbour construction: construction of 50,000 dwt and 15,000 dwt quay wall

    Products
    Tubular combined wall: 6,600  tons

    Owner
    Pumangol


    Warri Port Terminal C - Nigeria

    Project type
    Quay walls

    Products
    HZM combined walls: 1,771 tons
    Z sections: 373 tons
    Tie rods: 268 tons

    Owner
    Nigeria Ports Authority


    Warri Port Terminal B - Nigeria

    Project type
    Quay walls

    Products
    HZM combined walls: 2,666 tons
    Z sections: 397 tons

    Owner
    Nigeria Ports Authority


    Tema Port Berth 12 Expansion - Ghana

    Project type
    Quay walls

    Products
    Welded tubes: 4,806 tons
    Reinforcement bars: 5,315 tons

    Owner
    Ghana Ports and Habour Authority


    Paenal yard - Port Amboim | Angola

    Project type
    Harbour construction: construction of quay wall

    Products
    Z section sheet piles: 3,200  tons

    Owner
    SONANGOL, SBM and DSME


    StockGap Terminal Port Harcourt - Nigeria

    Project type
    Quay walls

    Products
    Tubular combined walls: 2,874 tons
    Z sections: 844 tons
    Tie rods: 427 tons

    Owner
    StockGap Fuels Limited


    2nd Niger Bridge - Nigeria

    Project type
    Bridges

    Products
    Welded tubes: 7,500 tons

    Owner
    Federal Government of Nigeria


    Aveon Offshore Egina Load Out Platform - Nigeria

    Project type
    Quay walls

    Products
    Tubular combined walls: 1,572 tons
    Welded tubes: 1,494 tons

    Owner
    Aveon Offshore 


    Saldanha Bay - Saldanha | South Africa

    Project type
    Harbour construction: upgrading of general maintenance quay

    Products
    HZM combined wall: 686 tons
    Tie-rods: 90 tons

    Owner
    Transnet National Port Authority


    Marsa Al Seef-creek Development - Dubai | UAE

    Project type
    Quay wall construction

    Products
    Sheet piles (AZ, AU, GU): 5,500 tons
    Tubes: 3,000 tons

    Owner
    Meeras


    Dhow Wharfage - Dubai | UAE

    Project type
    Quay wall construction

    Products
    Section sheet piles (AZ): 6,000 tons
    Tubes: 5,000 tons

    Owner
    Dubai Municipality


    Royal Atlantis Development - Dubai | UAE

    Project type
    Foundation of hotel buildings

    Products
    Sheet piles (GU/AU): 1,300 tons

    Owner
    Atlantis The Palm


    Corniche Development - Abu Dhabi | UAE

    Project type
    Quay wall construction

    Products
    Section sheet piles (AU): 3,000 tons

    Owner
    Abu Dhabi Municipality


    Hail Field Development - Abu Dhabi | UAE

    Project type
    Quay wall construction

    Products
    Sheet piles (AZ): 1,500 tons

    Owner
    Abu Dhabi Oil Company


    VLCC Jetty - Fujairah | UAE

    Project type
    Waterfront structures: jetty construction

    Products
    Foundation piles: 6,500 tons

    Owner
    Port of Fujairah


    Ruwais Refinery Expansion - Abu Dhabi | UAE

    Project type
    Waterfront structures: jetty construction

    Products
    Steel tubular piles: 60,000 tons

    Owner
    Abu Dhabi Oil Company


    KNPC Jetty - Kuwait

    Project type
    Waterfront structures: jetty construction

    Products
    Steel tubular piles: 12,000 tons

    Owner
    KNPC


    Quay wall Gaimukh Ghodbunder road Thane-West - Mumbai I India

    Project type
    Quay wall

    Products
    AU25   600 tons


    Riverfront development Kesi Ghat - Vrindhavan (Mathura), Uttar Pradesh I India

    Project type
    Riverfront development

    Products
    AU25 / GU20N / AZ46   2,800 tons

    Customer
    U.P Irrigation 

    Contractor
    Ajay Contractor

    Special and services

    • Design Advice
      Separate lengths of sheet pile recommended for ghat & non-ghat portion.
    • Redesign
      Replacing AZ46 single wall with AU 25 having main and anchor wall due to non-availability of AZ-46 in India resulting in both cost and time savings.
    • Combination of stock and new production as the tonnage required was not available in Indian stockyard.
    • Litigation
      Assisting the contractor in convincing National Green Tribunal that use of sheet pile does not cause any harm to environment.

    L&T construction temporary shoring project - Ambala, Haryana I India

    Project type
    Temporary shoring

    Products
    GU20N / GU16N   1,600 tons

    Main contractor
    L & T Ltd.

    Sub – contractor
    Construction Pvt. Ltd.

    Sheet pile contractor
    S B Protech Pvt. Ltd. 

    Specials and services

    • Welding
      Providing literature on welding of sheet pile at site as the length of sheet pile required was 24 m.
    • Driving
      The contractor was unable to drive sheet pile after a certain length due to presence of hard clay. ArcelorMittal India team recommended to perform staggered driving, use water jetting, use template. When contractor followed our advise, sheet pile driving became easy.

    Bagmati River Project - Bihar I India

    Project type
    Sheet pile solution for seepage protection in construction of head regulator

    Products
    OT22 12 m. length   330 tons
    Approved by Irrigation Department, Bihar

    Contractor
    Avantika Contractors

    Main Client
    Irrigation Department, Bihar


    Essar Terminals Shore Protection - Hazira | India

    Project type
    Flood walls

    Products
    Sheet piles (AZ 46-700N): 8,583 tons

    Owner
    Essar Group


    Shore Protection for Reliance - Hazira | India

    Project type
    Flood walls

    Products
    Sheet piles (AZ): 6,000 tons

    Owner
    Reliance Group


    Deep Draught Bulk Berth - Hazira | India

    Project type
    Quay wall

    Products
    Straight web sheet piles (AS 500-12.5): 11,853 tons

    Owner
    Essar Group


    Check Dam across Bharathapuzha - Kochi | India

    Project type
    Check dam

    Products
    Sheet piles (GU): 327 tons

    Owner
    Kerala Irrigation Infrastructure Development Corporation


    Signature Bridge - Delhi | India

    Project type
    Bridges

    Products
    Sheet piles (AU): 929 tons

    Owner
    Delhi Tourism and Transportation Development Corporation


    New Market Car Park - Kolkata | India

    Project type
    Underground car park

    Products
    Sheet piles (AZ): 1,110 tons

    Owner
    Simpark Infrastructure Pvt Ltd 


    Extension of Quay 3 - Kochi | India

    Project type
    Quay wall

    Products
    Sheet piles (AZ): 671 tons

    Owner
    Cochin Shipyard


    Pecém Expansion – São Gonçalo do Amarante ӏ Brazil

    Project type
    Harbour construction: quay wall

    Products
    Steel tubes + C9: 8,800 tons
    Sheet piles (AZ): 3,500 tons
    Anchorage: 4,600 tons

    Owner
    Cearáportos – State of Ceará Port Authority


    La Pastora - Madre de Dios | Peru

    Project type
    Border river reconstruction/erosion protection - environmental

    Products
    Steel tubes: 6,260 tons
    Sheet piles: 2,020 tons
    HZM combined walls: 4,040 tons
    Anchorage: 150 tons

    Owner
    Odebrecht Latinvest Operaciones y Mantenimiento SAC


    OXEC 2 - Alta Verapaz | Guatemala

    Project type
    Hydropower - dam wall

    Products
    Straight web sheet piles (AS 500): 1,742 tons

    Owner
    Solel Boneh International Guatemala 


    The Beloomut waterworks facility - Kuzminsk | Russia

    Project type
    Waterworks facility

    Products
    Sheet piles: 12,000 tons

    Owner
    State project

    Watch the impressive customer movie of this project


    Turkmenabad Farap bridge - Lebap province I Turkmenistan

    Project type
    Highway and railway bridges construction

    Products
    Sheet piles: 12,000 tons

    Owner
    Turkmen Ministry of Railway and Transport


    Cargo transportation route - Atyrau Region | Kazakhstan

    Project type
    Berth construction

    Products
    Sheet piles PU 32M: 5,000 tons
    Tie-rods: 2,000 tons

    Owner
    TengizChevrOil


    Navy pier - Aktau | Kazakhstan

    Project type
    Berth construction

    Products
    HZM-AZ: 1,800 tons
    Tie-rods: 130 tons


    Western High Speed diameter - Saint-Petersburg | Russia

    Project type
    High-speed urban highway

    Products
    Sheet piles: 15,000 tons

    Owner
    Saint-Petersburg government